Warning: Can't synchronize with repository "(default)" (/home/git/ome.git does not appear to be a Git repository.). Look in the Trac log for more information.
- Timestamp:
-
12/10/10 18:10:23 (13 years ago)
- Author:
-
saloynton
- Comment:
-
Legend:
- Unmodified
- Added
- Removed
- Modified
-
-
Property
Sprint
changed from
to
2010-12-09 (21)
-
Property
Type
changed from
story
to
requirement
-
v2
|
v5
|
|
1 | 1 | A review of the interface/testing. To determine a suitable timeframe as first phase of work is with testing. |
2 | 2 | Meeting to be arranged the week beginning 29th Nov 2010. |
| 3 | |
| 4 | Following the overview discussion (#3612 User Meeting: 26/11/2010) information of the specific details of the share is required. |
| 5 | i.e. Who is the owner, who is a member in the share |
| 6 | This needs to be then contrasted against what is currently possible in permissions and how it meets the needs. The share concept needs to be clarified to ensure that it is reflected in the work. |
| 7 | |
| 8 | A meeting has been arranged for the week beginning 13th Dec. |
| 9 | |
1.3.13-PRO © 2008-2011
Agilo Software all
rights reserved
(this page was served in: 0.16601 sec.)