Warning: Can't synchronize with repository "(default)" (/home/git/ome.git does not appear to be a Git repository.). Look in the Trac log for more information.
Notice: In order to edit this ticket you need to be either: a Product Owner, The owner or the reporter of the ticket, or, in case of a Task not yet assigned, a team_member"

Task #3887 (closed)

Opened 13 years ago

Closed 13 years ago

Meeting 10/01/11

Reported by: saloynton Owned by:
Priority: minor Milestone: OMERO-Beta4.3
Component: Usability Version: n.a.
Keywords: n.a. Cc: atarkowska, Jburel, wmoore
Resources: n.a. Referenced By: n.a.
References: n.a. Remaining Time: n.a.
Sprint: 2011-01-27 (4)

Description (last modified by saloynton)

Following a web meeting on reviewing the the web interface against insight interface.
The review was focused on right hand panel and the central similarities and difference. The central points identified were on the range and what type of consistency between the web and insight is required. It was identified that this would require a larger discussion with the wider team. The short term work that will be required to be brought to this discussion is the range of aspects that need to be discussed so that a policy may be decided.

Present: Ola Scott.

Actions required:

  • Require nightshade stats (Find who creates lots of datasets within a month + how many images are there. The cycle of the the import needs to be checked and to find out the various scenarios of how much information is required to be presented.).

ACTION move to ticket Task (#4025)

  • Complete remaining review of 3 web screenshots.


Updated - Two out of the three screenshot reviewed(search & public). There has also been the additional review of the me page and the investigation of the use of a user card. The final screenshot review of the calendar relates to the ticket #3872 and work required of insight with the combination of history (of import, etc) + calendar + images tab. The correlation between them if any needs to be confirmed at the meeting.

  • Schedule review with JM to determine what needs to be replicated.

Updated Meeting Tuesday 25th Jan- The agenda for the meeting is to 1) determine what of the aspect of the work that will be taken on against the ongoing work of the release. 2) Determine the required interface correlation between insight and the web.

  • A table will be created with the 3 column of: Required to be consistent between applications, Required to be different between applications and no correlation.

-To check/review existing tickets that may help inform this.

  • UPDATE: This work and information is now in being done in User Story #4023.

Change History (5)

comment:1 Changed 13 years ago by saloynton

  • Description modified (diff)

comment:2 Changed 13 years ago by saloynton

  • Status changed from new to accepted

comment:3 Changed 13 years ago by saloynton

  • Cc wmoore added
  • Description modified (diff)

comment:4 Changed 13 years ago by saloynton

  • Owner saloynton deleted
  • Status changed from accepted to new

comment:5 Changed 13 years ago by saloynton

  • Description modified (diff)
  • Resolution set to fixed
  • Status changed from new to closed
Note: See TracTickets for help on using tickets. You may also have a look at Agilo extensions to the ticket.

1.3.13-PRO © 2008-2011 Agilo Software all rights reserved (this page was served in: 0.76734 sec.)

We're Hiring!