Warning: Can't synchronize with repository "(default)" (/home/git/ome.git does not appear to be a Git repository.). Look in the Trac log for more information.
- Timestamp:
-
02/17/11 18:07:48 (14 years ago)
- Author:
-
saloynton
- Comment:
-
Legend:
- Unmodified
- Added
- Removed
- Modified
-
-
Property
Status
changed from
new
to
accepted
- Property Owner set to saloynton
-
v4
|
v8
|
|
9 | 9 | |
10 | 10 | UPDATE: The items highlighted in bold are completed in the document attached. |
| 11 | |
| 12 | UPDATE: The remaining two apps have been reviewed. The one aspect raised in the discussion of the work |
| 13 | was the advantage of a event driven calendar view. This removed the need to fully implement a calendar |
| 14 | and so face the challenge of making it compatible with other existing calendars. As well facing the challenge of |
| 15 | forcing users to adopt a new calendar. |
| 16 | |
| 17 | NOTE: Before ticket closed need to check where the priority is for the work and if more suitable to pick up later? |
1.3.13-PRO © 2008-2011
Agilo Software all
rights reserved
(this page was served in: 0.15443 sec.)