Warning: Can't synchronize with repository "(default)" (/home/git/ome.git does not appear to be a Git repository.). Look in the Trac log for more information.

Changes between Version 4 and Version 8 of Ticket #4314


Ignore:
Timestamp:
02/17/11 18:07:48 (13 years ago)
Author:
saloynton
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Ticket #4314

    • Property Status changed from new to accepted
    • Property Owner set to saloynton
  • Ticket #4314 – Description

    v4 v8  
    99 
    1010UPDATE: The items highlighted in bold are completed in the document attached. 
     11 
     12UPDATE: The remaining two apps have been reviewed. The one aspect raised in the discussion of the work  
     13                 was the advantage of a event driven calendar view. This removed the need to fully implement a calendar 
     14                 and so face the challenge of making it compatible with other existing calendars.  As well facing the challenge of  
     15                 forcing users to adopt a new calendar.  
     16                  
     17NOTE: Before ticket closed need to check where the priority is for the work and if more suitable to pick up later? 

1.3.13-PRO © 2008-2011 Agilo Software all rights reserved (this page was served in: 0.14630 sec.)

We're Hiring!