Warning: Can't synchronize with repository "(default)" (/home/git/ome.git does not appear to be a Git repository.). Look in the Trac log for more information.
Notice: In order to edit this ticket you need to be either: a Product Owner, The owner or the reporter of the ticket, or, in case of a Task not yet assigned, a team_member"

Task #6827 (closed)

Opened 13 years ago

Closed 13 years ago

Training session

Reported by: saloynton Owned by: saloynton
Priority: minor Milestone: OMERO-4.4
Component: General Version: n.a.
Keywords: n.a. Cc: jburel, wmoore, atarkowska
Resources: n.a. Referenced By: n.a.
References: n.a. Remaining Time: 0.0d
Sprint: n.a.

Description (last modified by saloynton)

A training session has been scheduled to provide the lecturer with a basic overview to getting started with OMERO and for the administrative role, he will need to operate for managing his teaching groups.

Feedback

The general comments and feedback covered how the students would be viewing the images. The
point was made that for the early use of the viewer that it shall need to look and be as simple as possible.
This is not to say such functionality would not be useful in the future, but the current requirement
is to provide the students with a simplified view with the aim that that can pick it up to use as easy

This list of options below discussed to be unnecessary:

  • Viewing options of max intensity and split channel
  • Line plot
  • Rendering details
  • Image information
  • Image Link

This leaves the viewer with the options of:

  • Zoom
  • ROI's
  • The additional piece of information that he would wished to be displayed is the file name on the top on the image

viewer. The label currently displayed here is - full viewer.

  • A further requirement was made to make the image description and comments on the image viewable in the image viewer.

Change History (5)

comment:1 Changed 13 years ago by jburel

when is the session?

comment:2 Changed 13 years ago by jburel

training day 13/10

comment:3 Changed 13 years ago by saloynton

Referencing ticket #6166 has changed sprint.

comment:4 Changed 13 years ago by saloynton

  • Milestone changed from OMERO-Beta4.3.2 to OME-5.0

comment:5 Changed 13 years ago by saloynton

  • Cc wmoore atarkowska added
  • Description modified (diff)
  • Remaining Time changed from 0.25 to 0
  • Resolution set to fixed
  • Status changed from new to closed
Note: See TracTickets for help on using tickets. You may also have a look at Agilo extensions to the ticket.

1.3.13-PRO © 2008-2011 Agilo Software all rights reserved (this page was served in: 0.66854 sec.)

We're Hiring!