Warning: Can't synchronize with repository "(default)" (/home/git/ome.git does not appear to be a Git repository.). Look in the Trac log for more information.
- Timestamp:
-
08/31/12 12:16:13 (12 years ago)
- Author:
-
jburel
- Comment:
-
To test first item
- Import an image using insight. When the import is finished. Mouse over the thumbnail should display the tool tip.
- Import an image using the importer. When the import is finished. Mouse over the thumbnail, no tooltip.
- Repeat the same with a plate.
To test second item
- Select a user belonging to 2 groups, e.g. user-3
- Select one item from each group.
- Select a script to run e.g. Export images
- A message should be displayed. Check if wording is clear enough
Legend:
- Unmodified
- Added
- Removed
- Modified
-
-
Property
Status
changed from
new
to
closed
-
Property
Resolution
changed from
to
fixed
-
initial
|
v1
|
|
1 | 1 | Fix minor points reported during sprint 3 see https://docs.google.com/spreadsheet/ccc?key=0ArfUkRuStsCEdFVka1JPZ2s4RDJzQTAtN3M3bzhScVE#gid=8 |
2 | 2 | |
3 | | * Tool tip display |
4 | | * wording when analysing data. |
| 3 | * Tool tip display (import) |
| 4 | * wording when analysing data. (run scripts) |
1.3.13-PRO © 2008-2011
Agilo Software all
rights reserved
(this page was served in: 0.12064 sec.)